On Monday, March 27, the ECUA’s Nine Mile Road Well was placed into service after being down for routine maintenance for approximately three months. Within a short time, our staff noticed that the pH of the source water was lower than normal, and subsequently determined that the pH equipment at the well was not sufficiently raising the level of the finished (treated) water to the expected level.