Listed below are the Sections of the Current ECUA Engineering Manual, approved on December 18, 2014 along with Update #1 dated 9/1/16. General questions about the Manual can be e-mailed to ecuaeng.contact@ecua.fl.gov. Project specific questions related to the Manual's contents should be directed to the ECUA Engineer, Inspector, and/or Engineer-of-Record of that project.
ATTENTION:
ECUA issued Update #1 to the Engineering Manual on September 1, 2016. Capital Improvement Projects, System Extensions, and Single Service Connections shall utilize the appropriate Manual per the following:
Projects Submitted to ECUA | Shall Use Manual |
---|---|
prior to September 1, 2016 | December 18, 2014 Edition |
on or after September 1, 2016 | Septmber 1, 2016 Update #1 |
Per below, files for both the December 18, 2014 Manual and September 1, 2016 Update #1 are available. Click Here to view the "Summary of Revisions for Update #1"
Please click here for a full printable PDF version (Divisions 1-5) of the current ECUA Engineering Manual. Please remember to print two-sided.
Division 1- Procedures | 12/18/14 Edition | Update #1 9/1/16 | |
---|---|---|---|
Procedure 1 | Engineering Manual Users Guide | View PDF | View PDF |
Procedure 2 | Review and Approval of Water/Sewer System Extensions | View PDF | View PDF |
Procedure 3 | Review and Approval of Single Service Connections | View PDF | View PDF |
Procedure 4 | Contract Administration for CIP Projects | View PDF | View PDF |
Procedure 5 | Septic Tank Abatement Policy | View PDF | View PDF |
Procedure 6 | Oversizing | View PDF | View PDF |
Procedure 7 | Review and Approval of Grinder Pump Reimbursement Requests | View PDF | View PDF |
Procedure 8 | New Product Review and Approval | View PDF | View PDF |
Procedure 9 | Property Acquistion and Easements | View PDF | View PDF |
Procedure 10 | Miscellaneous Information | View PDF | View PDF |
*Please note that some browsers will not automatically download DWG files for security reasons. To download DWG files, right-click on the file, then copy link address into a new window*
Division 2 - Design Standards | 12/18/14 Edition | Update #1 9/1/16 | DWG | |
---|---|---|---|---|
Section 101 | Plan Preparation | View PDF | View PDF | N/A |
Section 556 | Water Distribution Systems | View PDF | View PDF | N/A |
Section 570 | Gravity Sewer Collection Systems | View PDF | View PDF | N/A |
Section 575 | Wastewater Lift Stations | View PDF | View PDF | N/A |
Section 576 | Wastewater Force Main Systems | View PDF | View PDF | N/A |
DS-0.1 & 0.2 | Lift Stations Design Standard Drawings Instructions | N/A | View PDF | N/A |
DS-1 | Title Sheet | N/A | View PDF | View DWG |
DS-2 | Site Plans | N/A | View PDF | View DWG |
DS-3.1 | Wet Well, Pumps, Piping | N/A | View PDF | View DWG |
DS-3.2 | Wet Well, Pumps, Piping with Flow Meter | N/A | View PDF | View DWG |
DS-4 | Site-Civil-Mechanical Details 1 | N/A | View PDF | View DWG |
DS-5 | Site-Civil-Mechanical Details 2 | N/A | View PDF | View DWG |
DS-6 | Site-Civil-Mechanical Details 3 | N/A | View PDF | View DWG |
DS-7 | Site-Civil-Mechanical Details 4 | N/A | View PDF | View DWG |
DS-8 | D.E.D Performance Design Criteria | N/A | View PDF | View DWG |
DS-9 | D.E.D Title Sheet | N/A | View PDF | View DWG |
DS-10 | Electrical Symbols and Abbreviations | N/A | View PDF | View DWG |
DS-11 | Single Line Diagram Options | N/A | View PDF | View DWG |
DS-12.1 | PDS - Sheet 1 (incl. Power Feeder Circuit Option 1) | N/A | View PDF | View DWG |
DS-12.2 | Power Feeder Circuit Options 2-5 | N/A | View PDF | View DWG |
DS-13 | PDS - Sheet 2 | N/A | View PDF | View DWG |
DS-14.1 | Power Panel - Equipment Lists and Notes | N/A | View PDF | View DWG |
DS-14.2 | Power Panel - HP Related Components Equipment Lists | N/A | View PDF | View DWG |
DS-15 | Power Panel - Terminal Block Layout | N/A | View PDF | View DWG |
DS-16 | Power Panel - Interior Layout | N/A | View PDF | View DWG |
DS-17 | Power Panel - Misc. Bracket Details | N/A | View PDF | View DWG |
DS-18.1.1 | Pump 1 Panel - MSS - FVNR | N/A | View PDF | View DWG |
DS-18.1.2 | Pump 1 Panel - MSS - RVSS | N/A | View PDF | View DWG |
DS-18.1.3 | Pump 1 Panel - MSS - VFD | N/A | View PDF | View DWG |
DS-18.2.1 | Pump 2 Panel - MSS - FVNR | N/A | View PDF | View DWG |
DS-18.2.2 | Pump 2 Panel - MSS - RVSS | N/A | View PDF | View DWG |
DS-18.2.3 | Pump 2 Panel - MSS - VFD | N/A | View PDF | View DWG |
DS-19.1.1 | Pump 1 Panel - Interior Layout - FVNR | N/A | View PDF | View DWG |
DS-19.1.2 | Pump 1 Panel - Interior Layout - RVSS | N/A | View PDF | View DWG |
DS-19.1.3 | Pump 1 Panel - Interior Layout - VFD | N/A | View PDF | View DWG |
DS-19.2.1 | Pump 2 Panel - Interior Layout - FVNR | N/A | View PDF | View DWG |
DS-19.2.2 | Pump 2 Panel - Interior Layout - RVSS | N/A | View PDF | View DWG |
DS-19.2.3 | Pump 2 Panel - Interior Layout - VFD | N/A | View PDF | View DWG |
DS-20.1 | Pump Panels - Equipment Lists,Notes - FVNR | N/A | View PDF | View DWG |
DS-20.2 | Pump Panels - Equipment List, Notes - RVSS | N/A | View PDF | View DWG |
DS-20.3 | Pump Panels - Equipment List, Notes - VFD | N/A | View PDF | View DWG |
DS-21 | Pump Panels - Pump Protection Circuits | N/A | View PDF | View DWG |
DS-22 | Control Panel - Schematic | N/A | View PDF | View DWG |
DS-23 | Control Panel - Digital Inputs Schematic | N/A | View PDF | View DWG |
DS-24 | Control Panel - Digital Inputs and Outputs Schematic | N/A | View PDF | View DWG |
DS-25 | Control Panel - Analog Inputs and Outputs Schematic | N/A | View PDF | View DWG |
DS-26.1 | Control Panel - Motor Control - FVNR-RVSS | N/A | View PDF | View DWG |
DS-26.2 | Control Panel - Motor Control - VFD | N/A | View PDF | View DWG |
DS-27 | Control Panel - Interior Layout and Terminal Block | N/A | View PDF | View DWG |
DS-28 | Control Panel - Exterior Layout | N/A | View PDF | View DWG |
DS-29 | Control Panel - Equipment List and Schedules | N/A | View PDF | View DWG |
DS-30 | Control Panel - Intricsic Safe Relay Instructions | N/A | View PDF | View DWG |
DS-31 | Control Panel - Panel to Panel Wiring | N/A | View PDF | View DWG |
DS-31.1 | Control Panel - Panel to Panel Wiring Distribution | N/A | View PDF | View DWG |
DS-32.1 | Panel Enclosures - Layout, Frame - Linear, FVNR, RVSS | N/A | View PDF | View DWG |
DS-32.2 | Panel Enclosures - Layout, Frame - Linear, VFD, AC | N/A | View PDF | View DWG |
DS-32.3 | Panel Enclosures - Layout, Frame - Abutting, FVNR, RVSS | N/A | View PDF | View DWG |
DS-32.4 | Panel Enclosures - Layout, Frane - Abutting, VFD, AC | N/A | View PDF | View DWG |
DS-33.1 | HP Related Equipment and Conductors - 208V - 240V | N/A | View PDF | View DWG |
DS-33.2 | HP Related Equipment and Conductors - 480V | N/A | View PDF | View DWG |
DS-34 | Legends and Tags | N/A | View PDF | View DWG |
DS-35 | Control Panel General Notes | N/A | View PDF | View DWG |
MISC1 | Pump Mounting Baseplate Design | N/A | View PDF | View DWG |
Division 3- Technical Specifications | 12/18/14 Edition | Update #1 9/1/16 | |
---|---|---|---|
Section 1000 | Miscellaneous Project Support | View PDF | View PDF |
Section 1900 | Building Demolition | N/A | View PDF |
Section 2000 | Clearing and Grubbing/Grassing/Sodding | View PDF | View PDF |
Section 2100 | Earthwork | View PDF | View PDF |
Section 2221 | Trench Excavation, Backfill & Compaction | View PDF | View PDF |
Section 2300 | Horizontal Directional Drilling | View PDF | View PDF |
Section 2310 | Jack and Bore | View PDF | View PDF |
Section 2320 | Cured-in-Place Pipe Lining (CIPPL) | View PDF | View PDF |
Section 2330 | Cured-in-Place Lateral Lining (CIPPL) | View PDF | View PDF |
Section 2340 | Pipe Bursting | View PDF | View PDF |
Section 2350 | Test and Seal | View PDF | View PDF |
Section 2556 | Water Distribution Systems | View PDF | View PDF |
Section 2570 | Gravity Sewer Collection Systems | View PDF | View PDF |
Section 2573 | Manhole Coatings and Rehabilitation | N/A | View PDF |
Section 2575 | Wastewater Lift Stations | View PDF | View PDF |
Section 2576 | Wastewater Force Main Systems | View PDF | View PDF |
Section 2577 | Fiberglass Wet Wells | View PDF | View PDF |
Section 2578 | Wet Well Coatings and Rehabilitation | N/A | View PDF |
Section 2651 | Television Inspection | View PDF | View PDF |
Section 2830 | Fencing | View PDF | View PDF |
Section 3200 | Cast-In-Place Concrete | N/A | View PDF |
Section 3300 | Paving for Driveways and Parking Areas | View PDF | View PDF |
Section 4000 | Record Drawings | View PDF | View PDF |
Section 16010 | Basic Electrical Requirements | View PDF | View PDF |
Section 16050 | Basic Electrical Materials and Methods | View PDF | View PDF |
Section 16055 | Overcurrent Protective Device Coordination | View PDF | View PDF |
Section 16060 | Grounding and Bonding | View PDF | View PDF |
Section 16073 | Hangers and Supports for Electrical Systems | View PDF | View PDF |
Section 16075 | Electrical Identification | View PDF | View PDF |
Section 16120 | Conductors and Cables | View PDF | View PDF |
Section 16130 | Raceways and Boxes | View PDF | View PDF |
Section 16211 | Electricity Metering | View PDF | View PDF |
Section 16410 | Enclosed Circuit Breakers | View PDF | View PDF |
Section 16521 | Exterior Lighting | View PDF | View PDF |
Section 16900 | Systems Integration | View PDF | View PDF |
Section 16910 | Control Panel Construction | View PDF | View PDF |
Section 16950 | Field Instruments | View PDF | View PDF |
Division 4 - Construction Details | 12/18/14 Edition | Update #1 9/1/16 | |
---|---|---|---|
D-1 | Sewer Lateral Connection | View PDF | View PDF |
D-2 | New Cleanout Installation on Existing Lateral | View PDF | View PDF |
D-3 | Lateral Connection to CIPP- Lined Pipe | View PDF | View PDF |
D-10 | Standard Manhole | View PDF | View PDF |
D-11 | Manhole Frame and Cover | View PDF | View PDF |
D-12 | Shallow Manhole | View PDF | View PDF |
D-13 | Drop Manhole | View PDF | View PDF |
D-14 | Sanitary Sewer Grade Tolerance-Acceptable SAG Limits | N/A | View PDF |
D-19 | Manhole Adjustment | View PDF | View PDF |
D-20 | Low Pressure Residential Sewer Service | View PDF | View PDF |
D-21 | Force Main Connection to Manhole | ***** | View PDF |
D-22 | Low Pressure Flushing Connections | View PDF | View PDF |
D-23 | Sewer Check Valve Vault | View PDF | View PDF |
D-30 | Air Release Valve- Manual | View PDF | View PDF |
D-31 | Air Release/Vacuum Valve- Automatic for 10" and Smaller Mains | View PDF | View PDF |
D-32 | Air Release/Vacuum Valve- Automatic for 12" and Larger Mains | View PDF | View PDF |
D-40 | Water Service for 5/8", 1", and 1 1/2" Meters | View PDF | View PDF |
D-41 | Typical Chlorine Disinfection | View PDF | View PDF |
D-42 | Chlorine and Calcium Hypochlorite Required for Disinfection | View PDF | View PDF |
D-43 | Typical Valve and Box Installation | View PDF | View PDF |
D-44 | 2", 3", and 4" Meter Vault | View PDF | View PDF |
D-45 | 6", 8", and 10" Meter Vault | View PDF | View PDF |
D-46 | Existing Water Main Shutdown Best Management Practices | View PDF | View PDF |
D-47 | Typical Multiple Water Service Installation | View PDF | View PDF |
D-48 | Multiple Water Service Installation | N/A | View PDF |
D-50 | Typical Fire Hydrant Installation | View PDF | View PDF |
D-51 | Typical 2" Flush Hydrant | View PDF | View PDF |
D-52 | Typical Thrust Block Installation | View PDF | View PDF |
D-59 | Valve Box Adjustment | View PDF | View PDF |
D-60 | Pipe Envelope Requirements | View PDF | View PDF |
D-61 | Flexible Pipe Bedding | View PDF | View PDF |
D-62 | Pipe Joint Restraint Tabulation | View PDF | View PDF |
D-63 | Pipe Joint Restraint Reducers and Reducing Tees | View PDF | View PDF |
D-64 | Water/Sewer Separation | View PDF | View PDF |
D-65 | Typical Jack and Bore | View PDF | View PDF |
D-66 | Storm Sewer Vertical Separation | View PDF | View PDF |
D-67 | Pig/Swab Launch Pit | N/A | View PDF |
D-68 | Exposed Piping-Equipment Master Color Chart | N/A | View PDF |
D-70 | Regional Services Map and Personnel | N/A | View PDF |
D-100 | D-100- Lift Station Drawings | View PDF | N/A |
D-100+ | D-100+ 240-208V 3-phase 1HP- 15HP FVNR Panel Design | View PDF | N/A |
D-100+ | D-100+ 240-208V 3-phase 1HP- 15HP FVNR Panel Design-Alternate | View PDF | N/A |
D-100+ | D-100+ 240- 208V 3-phase 1HP- 20HP VFD Electrical Standard | View PDF | N/A |
D-100+ | D-100+ 240- 208V 3-phase 1HP- 20HP VFD Electrical Standard- Alternate | View PDF | N/A |
D-100+ | D-100+ 240- 208V 3-phase 20HP- 25HP RVSS Electrical Standard | View PDF | N/A |
D-100+ | D-100+ 240- 208V 3-phase 20HP- 25HP RVSS Electrical Standard- Alt | View PDF | N/A |
D-100+ | D-100+ 480V 3-phase 1HP- 15HP FVNR Electrical Standard | View PDF | N/A |
D-100+ | D-100+ 480V 3-phase 1HP- 15HP FVNR Electrical Standard- Alternate | View PDF | N/A |
D-100+ | D-100+ 480V 3-phase 1HP- 60HP VFD Electrical Standard | View PDF | N/A |
D-100+ | D-100+ 480V 3-phase 1HP- 60HP VFD Electrical Standard- Alternate | View PDF | N/A |
D-100+ | D-100+ 480V 3-phase 20HP- 60HP RVSS Electrical Standard ( | View PDF | N/A |
D-100+ | D-100+ 480V 3-phase 20HP- 60HP RVSS Electrical Standard- Alternate | View PDF | N/A |
Division 5 - Forms | 12/18/14 Edition | Update #1 9/1/16 |
---|---|---|
Agreement for Residential or Commercial Grinder Pump Station | View PDF | View PDF |
Application for Reimbursement for Grinder Pump Station | View PDF | View PDF |
Certification of Completion Form- Sewer | View PDF | View PDF |
Certification of Completion Form- Water | View PDF | View PDF |
Change Order Form | View PDF | View PDF |
ECUA Engineering Manual Reference Note | View PDF | View PDF |
Fire Hydrant Flow Data Form | View PDF | View PDF |
Pay Request Form | View PDF | View PDF |
Pipe Material Summary Chart | View PDF | View PDF |
ECUA Version of FDOT Utility Permit Special Instructions | View PDF | View PDF |
Lift Station Design Worksheet | View PDF | N/A |
Lift Station Milestone Sign-off Sheet | View PDF | View PDF |
Lift Station Manufacturers and Sales Contacts | View PDF | View PDF |
Lift Station Pump Overview Chart | View PDF | View PDF |
Lift Station Pump Selection Worksheet | View PDF | View PDF |
Notice of Intent (NOI) Permit | View PDF | View PDF |
Notification of Commencement of Construction | View PDF | View PDF |
Capacity Reservation Form | View PDF | View PDF |
Request for Single Service Connection | View PDF | View PDF |
Review of Privately-Owned Lift Station | View PDF | View PDF |
Certification of Developer | View PDF | View PDF |
System Extensions- Project Information Form | View PDF | View PDF |
Temporary Construction Easement | View PDF | View PDF |
Utility Service Agreement | View PDF | View PDF |
Water Meter Vault Access Agreement | View PDF | View PDF |
Information last updated December 11, 2023
Department Main Number: 850-969-3310
Map Room: 850-969-3311
Residential Connection Inquires: 850-476-0480, ECUA Customer Service
Name | Title | Office | Cell | |
---|---|---|---|---|
Don Palmer, P.E. | Deputy Executive Director of Engineering & Environmental Services | 969-6637 | 698-4662 | don.palmer@ecua.fl.gov |
Stacy Hayden, P.E. | Director of Engineering | 969-6648 | 777-7937 | stacy.hayden@ecua.fl.gov |
Bobby Adriano | Manhole Coordinator | 969-6657 | 698-9291 | robert.adriano@ecua.fl.gov |
Auturio Avant | Utility Construction Inspector | 969-6652 | 503-9580 | auturio.avant2@ecua.fl.gov |
Robert Baker | Utility Construction Inspector | 969-3317 | 698-9272 | robert.baker@ecua.fl.gov |
Eric Ball | Utility Construction Inspector | 969-6641 | 698-4615 | eric.ball@ecua.fl.gov |
Robert Barnes | Utility Construction Inspector | 969-6656 | 698-4614 | robert.barnes@ecua.fl.gov |
Clay Brown | Manhole Coordinator | 969-5860 | 530-1882 | clayton.brown@ecua.fl.gov |
Andre Calaminus | Right-of-Way Agent | 969-5822 | andre.calaminus@ecua.fl.gov | |
Lashaw Carter | Senior Office Assistant | 969-3310 | lashaw.carter@ecua.fl.gov | |
Tammy Clemmons | Confidential Assistant | 969-6639 | tammy.clemmons@ecua.fl.gov | |
Ronald Currier | Senior Engineering Technician | 969-6645 | ronald.currier@ecua.fl.gov | |
Cassidy Duncan, E.I. | Engineering Intern | 969-6510 | 525-8819 | cassidy.duncan@ecua.fl.gov |
Laura Earl | Confidential Assistant | 969-3315 | laura.earl@ecua.fl.gov | |
Keith Fell, P.E. | Manager of Engineering Projects | 969-6653 | 698-4375 | keith.fell@ecua.fl.gov |
David Forster | Engineering Technician | 969-6667 | david.forster@ecua.fl.gov | |
Jeremy Holcombe | GIS Analyst | 969-6672 | jeremy.holcombe@ecua.fl.gov | |
Jacob Kearley, P.E. | Manager of Utility Coordination | 969-5823 | 698-4766 | jacob.kearley@ecua.fl.gov |
Andrew Kelley | Utility Construction Inspector | 969-6651 | 698-4758 | andrew.kelley@ecua.fl.gov |
Peter Kummer, P.E. | Manager of Utility Development | 969-6643 | 393-0220 | peter.kummer@ecua.fl.gov |
David Liechty, P.E. | Senior Project Engineer | 969-6631 | 393-0025 | david.liechty@ecua.fl.gov |
Danny Meloy | Utility Construction Inspector | 969-6655 | 698-4606 | daniel.meloy@ecua.fl.gov |
Derek Pitts | Sewer Rehabilitation Tech | 969-6638 | 698-4608 | derek.pitts@ecua.fl.gov |
Evan Robertson, P.E. | Manager of Wastewater Infrastructure | 969-6501 | 525-8590 | mark.robertson@ecua.fl.gov |
Erin Tilley | GIS Manager | 969-6525 | erin.tilley@ecua.fl.gov | |
John Trypus | Utility Construction Inspection Supervisor | 969-6618 | 698-4660 | john.trypus@ecua.fl.gov |
Tina Robinson | Senior Office Assistant | 969-3313 | antonina.robinson@ecua.fl.gov | |
Derrick Williams | Utility Construction Inspector | 969-5831 | 490-6703 | derrick.williams@ecua.fl.gov |
James Williams | GIS Analyst | 969-6658 | james.williams@ecua.fl.gov | |
Josh Bell, P.E. | Project Engineer | 969-5825 | 619-6094 | james.bell@ecua.fl.gov |
James Vorpahl, P.E. | Senior Project Engineer | 969-5872 | 777-1124 | james.vorpahl@ecua.fl.gov |
Clarence Jackson | Senior Engineering Technician | 969-6522 | clarence.jackson@ecua.fl.gov |