ECUA crews will begin smoke testing of the sewer collection system lines in the Navy Point area on Tuesday, May 4, and Wednesday, May 5, to determine if there are areas where stormwater or groundwater are entering the sewer system. An overload of stormwater into the sewer system can lead to sewer system overflows (SSOs) during periods of intense rain.