Information about ITB 2025-06 Annual Water Well Maintenance and Repair
ECUA’s Bayou Marcus Boardwalk, located at 3051 Fayal Dr, will begin Phase One of a repair and replacement project on June 1st, 2024. During construction, the Alekai Drive entrance and the boardwa...
Information about CC2024-07 Belair Road (Chantilly Way - Monpellier Dr) Water Main Replacement
Information about CC2023-01 Airway Drive / Stockdale Avenue Sewer Expansion – Phase 1
Information about ITB 2023-24 Electric Motor and Submersible Pump Repair
Update: September 2, 2022 ECUA received an update from the supplier providing the two conveyor belts needed to operate the processing lines. They have again delayed the shipping date to today, Sept...
Update: 2/12/22, 10:15 a.m. ECUA crews have repaired the six-inch main, and service has been restored. Crews have flushed out lines and a Precautionary Boil Water Notice has been issued for the aff...
Information about CC2021 19 CIPLL and Point Repairs
Update: 7:30 pm, 5-14-21 ECUA is pleased to report that our crews and emergency contractor have completed the replacement of the damaged section of 30-inch pipe at the Bayou Marcus Water Reclamatio...
Update: 7/16/20, 9:20 p.m.ECUA crews completed repairs at Nine Mile Rd. / Hwy. 29 where a 16-inch water main was damaged by a construction contractor working on the Nine Mile Road project. ---ECUA ...